Human-Governed AI Consensus Methodology M1.0

M1.0 defines seven stages and fourteen steps of analysis: what is recorded before model runs, how an individual claim is verified against a source, and what allows a specialist to authorise release. This page sets out the sequence, each step’s control result and an illustrative review of a disputed deadline. System Passport, Clause 2.6.

The Author of the Concept and Methodology is Vladislav Naganov. The system overview explains its components; verification and evidence addresses acceptance checks and the limits of what their results establish.


What M1.0 governs

M1.0 specifies the analysis sequence and the conditions for proceeding. Comparison requires at least two different identified models; their primary outputs are preserved before mutual disclosure. The unit of comparison is an individual claim with its conditions and supporting basis, not the overall persuasiveness of an output. System Passport, Clauses 2.6–2.8.

Steps 1–4 record the question, authorised route and material version; steps 5–10 record independent positions, divergences, sources and critical findings; steps 11–14 record human decisions, revisions and the approved version. Using several models without the mandatory records does not constitute the full protocol. Clause 3.4 of the System Passport defines completeness.


Seven stages and fourteen steps

StageStepsStage result
1. Task Definition and Source Material Preparation1–4The task, processing mode, source-material list, versions, quality and known gaps are registered
2. Separate Initial Model Runs5–6Raw outputs from at least two different models are obtained and retained together with information about the run conditions
3. Claim Decomposition and Comparison7–8Verifiable claims are identified; agreements, divergences, single-model claims and incomparable formulations are recorded
4. Claim Verification Against Sources9Each material claim is assigned a source and verification status, or a limitation is expressly recorded
5. Critical Review10Potential errors, omissions, inaccurate references, counterexamples and alternative explanations are identified
6. Human Review and Revision11–12The specialist reviews material claims, makes decisions and prepares a corrected revision without concealing objective disagreements
7. Release and Record Retention13–14The final version and the limits of its use are approved; linked materials are retained in accordance with the access regime and retention period

The seven stages form the logical sequence. The fourteen steps identify the specific actions and control results required within that sequence.


Stage 1. Task Definition and Source Material Preparation

Before any generative model is used, the subject of the analysis, the intended recipient, the permitted data and the suitability of the source documents must be determined.

Step 1. Task Registration

The following are recorded:

  • the professional question;
  • the purpose of the analysis;
  • task boundaries;
  • the intended recipient;
  • the deadline;
  • the expected form of the result;
  • materiality criteria for claims and errors;
  • known limitations.

The task definition must distinguish the required result from a general discussion of the topic. If the question, boundaries or expected result are undefined, comparison of model outputs may be formal and unrelated to the actual task.

Step 2. Data Classification

The access regime and permitted data route are determined before processing. The process establishes:

  • whether the materials contain personal data or other restricted-access information;
  • which software tools and external services are permitted;
  • whether particular information must be excluded, reduced or anonymised;
  • permitted methods of transfer, storage and deletion;
  • applicable prohibitions and protective measures.

A statement by the Task Initiator that transfer is permissible is not sufficient if the lawful basis, authority or processing conditions have not been established. Processing does not begin where no authorised route exists.

Security & Confidentiality

Step 3. Source Material Registration

Each document or other source is assigned an identifier. Its title, date, version, provenance, format, availability and known defects are recorded.

The following are marked separately:

  • missing documents;
  • illegible or damaged passages;
  • unverified provenance;
  • potentially missing appendices;
  • discrepancies between copies;
  • changes made after the analysis began.

Adding or replacing a material item creates a new version of the source set. The preceding version is retained and linked to the subsequent one.

Step 4. Source Material Preparation

Only authorised transformations are performed: text recognition, file splitting, numbering, format conversion and technical normalisation.

The transformed output is checked before use. In particular, material dates, amounts, identification details, clause numbers, tables, footnotes and passages in which recognition quality may affect the conclusion are checked against the original.

Stage result: a registered task, authorised processing route, source-material list and recorded limitations affecting their quality and completeness.

Human control: approval of the task definition, permitted data composition, processing methods and suitability of the prepared materials.


Stage 2. Separate Initial Model Runs

The purpose of this stage is to obtain several initial positions without mutual influence between analysis branches.

Step 5. Independent Model Runs

The same recorded task is provided to at least two different identified generative AI models. Comparable runs use the same version of the source materials.

A primary branch does not receive other model outputs before completing and retaining its own output. A synthesis or critical branch may receive them only afterwards.

Procedural separation does not mean that the models were trained on wholly different data or never use similar sources. Agreement between their outputs therefore remains a basis for verification, not proof of truth.

Multiple outputs from the same model may be used to assess repeatability, but they do not constitute agreement between different models.

Step 6. Preservation of Raw Outputs

The output of each primary branch is retained before editing or combined synthesis. It is linked to a run identifier and information establishing the conditions in which it was produced: the model, its version or recorded state, provider, date and time, instructions, parameters and tools used.

A repeated run does not replace the initial output. Both results are retained as related but separate records.

Stage result: separate raw outputs and information about the conditions in which they were produced.

More about multi-model comparison


Stage 3. Claim Decomposition and Comparison

Complete model outputs may differ in style, structure and level of detail. The unit of comparison is therefore not an entire output but an individual verifiable claim with its conditions and caveats retained.

Step 7. Claim Decomposition

Outputs are decomposed into standalone claims concerning one fact, rule, interpretation, professional conclusion, recommendation, assumption or limitation.

A complex sentence is divided where its parts require different sources or may receive different verification statuses. Conditions, exceptions and caveats are not discarded for brevity.

The type of a claim and its substantiation status are different characteristics. A claim may, for example, be factual in type but unsubstantiated after review.

Step 8. Position Comparison

For each pair of related claims, the relationship is classified as:

  • agreement on the claim and compatible supporting bases;
  • a similar conclusion based on different supporting bases;
  • partial agreement;
  • direct contradiction;
  • a difference in legal, calculation, project or other professional assessment;
  • a claim advanced by only one model;
  • an inability to compare reliably because of differences in wording, detail or context.

A single-model claim is not excluded merely because other models did not mention it. An agreed claim is not treated as correct merely because several models repeated it. Both require verification.

Direct contradictions and differences in professional assessment are referred to the specialist. They must not be removed by averaging the wording or concealed within a combined text.

Stage result: a consolidated claim comparison preserving agreements, divergences, omissions and conditions.

How model conclusions are compared


Stage 4. Claim Verification Against Sources

Step 9. Claim-to-Source Traceability

Each material claim is linked to a precise source: a document, its identification details, page, section, clause, passage, rule, calculation or other checkable supporting basis. A human then checks not only that a reference exists, but that the source actually supports the claim as formulated.

A model’s paraphrase does not replace a primary source. If the source is unavailable, irrelevant to the claim, contradicts it or supports only a narrower conclusion, the status records that fact.

After verification, the claim receives one of the following substantive statuses:

StatusWhen it is used
VerifiedA precise primary source has been found and the specialist has checked that the claim corresponds to it
Verified with a caveatA supporting basis exists, but applicability depends on an expressly stated condition or incomplete materials
DisputedCompeting sources, interpretations or positions exist and the divergence is disclosed
Not substantiatedNo sufficient supporting basis has been found in the available materials
RefutedAn available primary source directly contradicts the claim
Additional source or material requiredThe claim cannot be verified within the available data
Subject-matter decision requiredFactual checking alone is insufficient; a professional characterisation or choice is required

The absence of a sufficient supporting basis must not be concealed by neutral wording. An unsubstantiated claim is either excluded from the final conclusion or retained with its status and limits of use expressly stated.

Stage result: a table of material claims and sources showing the supporting basis, precise source location, status and specialist decision.

More about claims and source verification


Stage 5. Critical Review

Step 10. Critical Review Pass

After the initial comparison, a separate pass is performed not to confirm the emerging conclusion but to identify grounds for revising it.

The review examines:

  • potential counterexamples;
  • omitted circumstances and documents;
  • inaccurate or irrelevant references;
  • errors in dates, amounts, identification details and quotations;
  • the effect of text-recognition quality;
  • competing rules and document revisions;
  • alternative explanations of the facts;
  • conditions in which the conclusion would cease to apply;
  • the possibility that different models repeated the same error.

The critical branch does not itself assign verified-fact status to a finding. It generates questions and potential defects that are checked against sources and resolved by a human.

If an identified error could change a material professional conclusion, release is blocked until the defect is remedied or the specialist documents why an expressly disclosed limitation is acceptable. A risk of unauthorised data transfer or autonomous release requires the affected process to be stopped.

Stage result: a critical review report and a record of decisions on identified findings.


Stage 6. Human Review and Revision

Step 11. Professional Review

The authorised specialist verifies material claims against primary sources and makes decisions that cannot be delegated to a model.

In particular, the human:

  • verifies facts, dates, amounts, identification details, quotations and references;
  • assesses the relevance, permissibility, reliability and currency of sources for the task;
  • chooses the legal, project, calculation or other professional characterisation;
  • resolves direct contradictions and differences in interpretation;
  • determines the significance of missing materials;
  • accepts or rejects recommendations;
  • establishes the limits of applicability of the conclusion;
  • records a decision on each material finding.

A model may propose an option, but it does not make the final professional decision or approve the material.

Step 12. Revision and Remediation

Substantiated defects are corrected. Objective divergences, material caveats, unsubstantiated claims and limitations are not removed merely to make the narrative appear seamless.

If a correction changes the substance of the result, a new linked version is created. The raw outputs and previous revision are retained for the applicable period and under the applicable access regime.

Stage result: a reviewed draft deliverable in which professional conclusions are distinguished from facts, interpretations, recommendations, assumptions and limitations.

More about the human role and decisions


Stage 7. Release and Record Retention

Step 13. Release

Before release, the following are approved:

  • the final revision;
  • the date and version;
  • the person who reviewed and approved the result;
  • the recipient and intended purpose;
  • the scope of applicability;
  • material limitations and assumptions;
  • the set of appendices to be delivered;
  • the transfer mode and method.

Intermediate model text does not acquire the status of a professional opinion, memorandum, legal position or project decision without this review and approval.

Step 14. Record Retention

The source materials, configuration information, primary model outputs, position comparison, source-verification data, critical review report, specialist decisions and release record are retained with the deliverable.

The retention period and regime are determined by the applicable requirements and conditions of the particular task. Access is restricted according to assigned authority. A new revision does not overwrite its predecessor, and destruction after expiry of the retention period is recorded where required by the adopted process.

Stage result: an approved professional deliverable and a linked, reviewable set of working records.


When a deliverable may be released

A deliverable may be released only where all of the following conditions are met:

  1. The versions of the task, source materials, methodology and run configuration are recorded.
  2. Separate primary model outputs and the critical review result are retained.
  3. Every material claim has a status and a precise reference to its supporting basis, or is expressly disclosed as a limitation.
  4. Unresolved direct contradictions are not concealed within a combined conclusion.
  5. Material quotations, identification details, dates, amounts, and references to rules and documents have been checked.
  6. Material omissions, assumptions and limits of applicability are recorded.
  7. The final material has been reviewed and approved by an authorised specialist.

If any material condition is not met, the material remains a draft or internal analytical result and must not be presented as a reviewed professional conclusion.


Illustrative example: comparing a contract with performance documents

Question: which document supports the stage deadline? In the teaching materials, a contract specifies 15 September; a letter proposes 30 September and refers to a missing amendment. All materials are fictional. This is a MODE‑D illustration, not a completed client run.

Part of the workWhat is retained and checked
Source materialsThe contract and letter are registered separately; the missing amendment is recorded before execution.
Primary positionsOne model gives 30 September from the letter; another gives 15 September from the contract. Outputs are preserved separately before comparison.
Claim verification“The contract states 15 September” is checked against the exact clause. A proposal to reschedule does not by itself substantiate “the deadline changed to 30 September”.
Critical reviewThe reviewer checks whether a proposal has been mistaken for an effective change and identifies the material needed for verification.
Specialist decisionThe claim about the contract’s wording may receive STS‑P after verification. Checking the missing amendment requires additional material (STS‑O); assessing the correspondence’s legal significance requires professional judgement (STS‑H).

The draft memorandum separates the contractual wording, the letter’s proposal and the verification boundary. Receiving the amendment creates a linked new corpus version; the original outputs are not overwritten. This example does not determine the applicable deadline of a real obligation. System Passport, Clauses 2.4 and 2.7–2.13.

Related distinctions: legal assessment, requirements and acceptance, and versions and recognition.


How M1.0 manages limitations

M1.0 provides for recording incomplete source materials, source conflicts, recognition errors, model variability and specialist decisions. These circumstances are reviewed, assigned an express status and taken into account when determining the limits of use of the result.

The methodology is designed for transparent review of supporting bases and the process followed. Model agreement directs further verification, while the final professional decision remains with the authorised specialist.

All limitations of Human-Governed AI Consensus


Confidentiality and the public website

The public website explains the methodology, but it is not an environment for submitting documents relating to real cases or projects.

Case materials, personal data, trade secrets, credentials, keys or other restricted-access information must not be submitted through the public website. Such work requires a separately established lawful and secure processing arrangement.

Security & Confidentiality rules


Methodology documentation

Methodology M1.0 is described in the Human-Governed AI Consensus System Passport AIC-SP-001/2026, Revision 1.0. Information about the document revision, change history and internal acceptance checks T‑01—T‑10 is presented in the related sections.

For each professional run, the applicable revisions of M1.0 and P‑HYB‑1.0 are linked to its CFG‑C, source materials, review results and release decision.


Methodology M1.0 Technical Report

On 30 August 2026, Vladislav Igorevich Naganov published Human-Governed AI Consensus: Methodology M1.0: Technical Report in Zenodo. The report provides a detailed account of the mandatory M1.0 procedure, statuses for verifiable claims, source-verification requirements, human control and the records to be retained.

The publication has DOI 10.5281/zenodo.22172346 and is available under CC BY 4.0. It is a technical publication by the author: it presents the methodology and its evidential limitations but does not replace the System Passport or the records of a particular professional run.

Recommended citation: Naganov, Vladislav Igorevich. (2026). Human-Governed AI Consensus: Methodology M1.0: Technical Report (M1.0). Zenodo. https://doi.org/10.5281/zenodo.22172346.


Questions and answers

What is Human-Governed AI Consensus methodology M1.0?

M1.0 is the documented process for evidence-grounded use of generative AI: task definition, material preparation, separate runs by different models, comparison of verifiable claims, source verification, critical review, human decision, release and retention of the deliverable.

How many stages and steps does M1.0 contain?

In its concise presentation, M1.0 contains seven stages and fourteen steps. The stages show the overall logic of the process, while the steps identify the mandatory actions within it.

Are all stages mandatory?

Yes, if the work is described as performed under the full Human-Governed AI Consensus protocol. The depth of individual actions depends on the task and mode, but separate primary runs, verification of material claims against sources, a critical review pass and human approval of the result cannot be omitted.

How many models are required?

Cross-model comparison requires at least two different identified models. Their names, versions or recorded states and conditions of use are identified in the configuration for the particular run.

Do multiple outputs from the same model constitute model agreement?

No. Repeated outputs from one model may be used to assess repeatability, but they do not constitute agreement between different models.

What does separation between runs mean?

Separation provides procedural independence at the primary stage: each branch retains its own output before receiving results from other branches. Shared training data, providers or sources are considered separately.

Why are individual claims compared rather than entire outputs?

One output may contain correct facts, disputed interpretations, unsubstantiated assumptions and inaccurate references at the same time. Decomposition allows each material claim to be reviewed separately and prevents an assessment of one part from being applied to the entire output.

How is agreement between model outputs used?

Agreement between independently obtained positions determines the direction of further verification. A material claim receives verified status after comparison with a primary source and a specialist decision.

What happens if no source is found?

The claim is identified as not substantiated or as requiring an additional source or material. It must not be presented as an established fact.

Why is a separate critical review pass required?

It is used to identify counterexamples, omissions, inaccurate references, alternative explanations and errors shared by several models. Findings from the critical branch are also reviewed and are not treated as automatically correct.

Who makes the final decision?

The authorised specialist reviews and approves the final professional material. A generative model, Comparison Function or software build does not replace that decision.

May individual stages be repeated after an error or new document is identified?

Yes. When the source materials, run conditions or result change, a new linked version is created and the necessary actions are repeated. Previous outputs and revisions are not overwritten.

How does M1.0 manage the risk of error?

The methodology provides for separate analysis, source verification, a critical review pass, recording of limitations and human control. The release decision is made only after the mandatory checks have been completed.

May documents be uploaded for analysis through this website?

No. The public website is not intended for submitting case materials, personal data or other restricted-access information. A secure process for the particular task is organised separately.


Explore individual methodology elements